How to create a work order?

How to create a work order?

The Work Order (WO) is the entity that represents the maintenance job to be performed and which asset, location or route it refers to.



To create a new Work Order, select the option "Work | Work Orders";

  1. The list of work orders will be displayed;
  2. Press the "Create" button.
When creating and editing the work order, you must consider:
  1. You need to select the asset type and fill in the corresponding asset (equipment, tool, location or route).
  2. Only routes with at least one asset will be available.
  3. The SLA start date is automatically filled in when the work order is first transitioned to a state defined as "SLA Start".
  4. The SLA end date is automatically filled in when the work order is transitioned to a state defined as "SLA End". If the WO transitions more than once by the state defined as "sla end", the date is the last time it transitioned to the state with that configuration.
  5. The employee can only select routes in which he can access all route assets, the access to the assets is defined at the access level.
  6. It is not possible to add 2 duplicated maintenance plans to a work order.
  7. If the asset selected when creating the work order has the fields supplier and/or customer filled in, the value of those fields will be automatically inherited in the work order. If you wish otherwise, you can always change the fields and select other values.

When editing the work order, you must consider:

  1. If the work order is on the "Locked for changes" state, you cannot change any attribute, except the state and the observations if in the state configuration, the option "Allow to change observations" is inactive. If it is active, the field observations can be changed.


The state change is performed in the work order view interface and not on the work order editing interface.

To automatically close a work order, if it is in a state previous to the final state for over X days, it is necessary to access the option "Settings | Work | Background Services", activate the option "Enable Closing Work Orders" and define the number of days in "Close Work Orders After (days)".



    • Related Articles

    • How to consume spare parts on the work order?

      On the equipment or tool file, you can specify the parts and the corresponding quantities the equipment/tool needs to work correctly. The parts associated to the equipment/tool on the section "spare parts" can be consumed on the work order using the ...
    • How to create a related work order?

      Frequently, a maintenance technician is performing a work order and detects another problem, so he needs to solve it and log the work done. To log the work done, there are 3 options: Creating a new work order Adding additional tasks to the work order ...
    • How can I create a workshop?

      The workshops represent a way of organizing work groups by area, in order to be able to create access restrictions in the operations for allocation of costs to the work orders. To create a new workshop, select the option Workshop & Employees | ...
    • How do I create the work order type?

      Work order types allow you to classify the work orders and to apply specific behaviors after being configured. To create a new work order type, select the Definitions | Work | Work Order Types option: The list of work order types is presented; Press ...
    • How do I create the work order type?

      Work order types allow you to classify the work orders and to apply specific behaviors after being configured. To create a new work order type, select the Definitions | Work | Work Order Types option: The list of work order types is presented; Press ...